Pipes Going through Control Joints
There are few ways to handle the control joints depends it's done, do they have fibre cement sheets in between etc
The feeder pipes will go into the hardfill underneath the poly or penetrate through.
The floor pipes we can either dip it down below sawcut/control joints or add sleeves around the pipes.
Feeder pipes in the hardfill